MEPCO New Electricity Meter Connection Fee 2026
Constructing a new residential property, commercial shop, or industrial facility across South Punjab requires securing an official power grid connection from Multan Electric Power Company. Understanding the current tariff structures, demand notice cost breakdowns, and administrative application workflows helps property owners plan construction budgets accurately without facing unexpected financial delays. Applying for a MEPCO New Electricity Meter involves completing online registration on the central portal, undergoing site inspections by sub-divisional officers, and fulfilling official security deposits. This comprehensive guide provides an updated fee breakdown, step-by-step application instructions, required document checklists, and practical guidelines to ensure smooth meter installation.
Breakdown of Connection Charges and Official Security Deposits
The total fee for installing a new utility service is divided into distinct regulatory heads set by NEPRA. Paying through official bank vouchers ensures that no unauthorized extra charges or agent surcharges are levied on applicants.
Key components of the official demand notice include:
- Cost of Meter and Service Line Equipment: Covers the physical single-phase or three-phase digital meter unit, PVC service wire, main service breaker, and protective meter casing box.
- Security Deposit Funds: Refundable security reserves calculated based on the total sanctioned load requested by the applicant.
- Lab Testing and Verification Fees: Charges for pre-installation accuracy calibration and technical lab certification conducted by utility test labs.
- Capital Cost Surcharges: Contributions toward regional distribution transformers and grid infrastructure development for larger commercial or industrial loads.
Reviewing your itemized demand notice voucher ensures full transparency before making payments at designated bank branches.

Step-by-Step Procedure to Request a MEPCO New Electricity Meter
Multan Electric Power Company processes all new connection requests through the centralized Electricity New Connection (ENC) web portal to streamline application handling.
Follow these step-by-step instructions to register your application:
Step 1: Access the ENC Web Portal
Open your internet browser and visit the official Electricity New Connection (ENC) portal. Select ‘Apply New Connection’ from the main menu dashboard.
Step 2: Choose Category and Enter Property Details
Select Multan Electric Power Company as your distribution company (DISCO). Choose your connection category (Residential, Commercial, Agricultural, or Industrial) and select your respective sub-division.
Step 3: Complete Applicant Personal Information
Fill in the online form with your full name, father’s or husband’s name, valid 13-digit CNIC number, active mobile phone number, and exact site installation address.
Step 4: Upload Required Verification Scans
Upload clear digital scans of your CNIC, property ownership deed or legal allotment letter, neighbor’s reference bill copy, and an attested wiring test certificate.
Step 5: Submit Form and Download Registration Slip
Submit your online application and download the generated application form and tracking ID. Print a hard copy for physical submission to your local Sub-Divisional Officer (SDO).
Completing the digital submission for a MEPCO New Electricity Meter ensures your application is logged directly into the central database for field inspection assignment.
Required Documentation Checklist for New Meter Approval
Submitting a complete document binder during field verification prevents administrative file rejections and accelerates demand notice issuance.
Prepare the following paper file for the sub-divisional office:
- Attested CNIC Photocopy: Valid national identity card copy of the property owner or legal applicant.
- Proof of Property Ownership: Certified copy of the property sale deed, registry, allotment letter, or legal land lease agreement.
- Wiring Test Certificate: Certificate signed and stamped by an authorized licensed electrical contractor confirming internal building wiring safety.
- Neighboring Reference Bill Copy: A copy of a recent paid electricity bill from an immediate neighboring house or shop to establish local transformer mapping.
- Applicant Undertaking Affidavit: Stamped legal affidavit paper affirming that no prior unpaid utility arrears or illegal connections exist on the premises.
Submitting verified paperwork protects your file against unexpected delays during site feasibility reviews.
Read More About MEPCO Bill Correction 2026 Online Application Guide
Demand Notice Payment and Physical Installation Workflow
Once your application passes technical site verification by the Line Superintendent and SDO, the revenue department issues an official demand notice voucher.
The final installation workflow follows these technical steps:
- Issuance of Official Demand Notice: Collect the printed demand notice voucher listing itemized equipment and security fees from the SDO office or download it directly online.
- Payment at Designated Bank Branches: Deposit the exact voucher amount at designated commercial bank branches or authorized online banking portals before the due date expires.
- Submission of Paid Bank Receipt: Submit the paid bank copy of the demand notice back to the sub-divisional office to issue the Seniority Store Order.
- Physical Meter Mounting and Service Connection: Certified utility linemen visit your site, mount the new digital meter on the exterior wall, connect service drop cables to the main grid line, and activate power.
Understanding the full timeline for obtaining a MEPCO New Electricity Meter allows applicants to manage building construction schedules effectively without power interruptions.
Read More About MEPCO Net Metering Application Online 2026 Guide
Guidelines for Commercial and Agricultural Connection Categories
Commercial establishments, tube wells, and industrial units follow specific regulatory guidelines due to higher sanctioned loads and transformer capacity demands.
Important considerations for non-residential categories include:
- Three-Phase Connection Mandate: Commercial and industrial loads exceeding 5 kW require a mandatory three-phase digital meter setup.
- Dedicated Transformer Requirements: If the local distribution transformer is fully loaded, applicants may need to share transformer upgrade costs through special capital demand notices.
- NOC Clearances for Industrial Sites: Industrial units must submit environmental and local municipal No Objection Certificates (NOCs) alongside standard application files.
Adhering to specific load rules ensures safety compliance and long-term grid stability for high-consumption accounts.
Read More About MEPCO Bill Check By CNIC Number Guide 2026
Summary of Consumer Best Practices
Securing a modern, reliable utility connection requires following established administrative channels rather than relying on unverified third-party agents. By using official digital portals, double-checking itemized demand notices, and keeping complete document files ready, property owners across South Punjab can complete their connection process smoothly. Timely installation of a MEPCO New Electricity Meter ensures that your new home, shop, or farm operates with safe, legal, and uninterrupted electricity supply.